A pallet can arrive in full while the beach crew is still short of the hardware needed for a join. At receiving, count the packages the carrier hands over, then reconcile the contents against the accepted purchase order and its component schedule. Keep both results. A signature for three crates does little to resolve a later disagreement over the contents of crate two.

Put the purchase order, accepted drawing revision, packing list and supplier contact where the receiving team can use them. Include any agreed substitution or split shipment. If the order covers more than one beach, assign each package to its delivery lot before unlacing bundles or moving hardware to a common shelf.

Before opening a bundle

Check package identity and condition while the markings and packing arrangement are intact. Compare physical packages with shipping documents before breaking any bundle. Record the carrier reference, delivery time and count. If a band is broken or a corner is crushed, take one photograph of the whole package with its ID and another of the affected area. Describe the visible condition. Leave the cause open until the packaging and its contents have been examined.

Use the supplier’s package weights and dimensions to plan unloading and a clear inspection area. A folded delivery note that lists a roll length gives the crew very little information about the mass of a bundled shipment. Confirm the site’s handling arrangements before moving it. For UK teams, the HSE provides guidance on assessing and reducing manual handling risks. HSE manual handling guidance

Make the packing list answer to the order

For each order line, write the supplier’s description and reference, the quantity ordered, the quantity on the delivery note and the quantity actually identified. Keep the units visible. A kit on the order should have a defined contents list. A section may be one item within a rolled or wrapped package. Confirm which section width, length or version belongs to the route.

Check this line Compare at the receiving point Example entry when it differs
Mat sections Product reference, ordered configuration, quantity and package ID Two labelled sections received for the east entrance. One additional section has an unreadable label.
Connection components Part reference, kit contents, count and section compatibility Required joint kit present, contents still to be checked against its list.
End, edge and fixing parts Ordered locations and the specific parts allocated to them Finish piece for the seaward end missing from its identified package.
Spares and instructions Separate spare quantities and current instructions covering the delivered system Spare bag received. Drawing supplied describes an earlier connection.

For example, suppose the order specifies four matching connection kits. Three are identifiable and an unmarked bag contains similar fasteners. Enter three identified kits and one unidentified bag. Keep the unmarked bag with its package reference and ask for confirmation. Counting it as the fourth kit would hide exactly the uncertainty the site installer needs to know about.

Open and inspect the agreed sample

Select the sections called for by the purchase agreement or the buyer’s agreed sampling plan. Include any package with a visible exception in the investigation and record the lot or bundle it came from. Lay the sample out by the supplied method in a suitable area. Inspect its running surface, section edges, connection features and the accessories that arrived with it.

Measure the dimensions specified by the order using the agreed reference points and condition. Where permitted, compare the mating ends with the actual joint kit. Check whether the parts can be identified, align as shown on the drawing and are free of obvious transport damage. Store the visible observations with the sample ID. A receiving inspection on a warehouse floor establishes the condition of that sample under those circumstances. The installed route will have its own opening inspection. Seasonal beach mat opening checks

Illustration of beach access mat sections and their layout.

Release identified stock and resolve the shortfall

Give the installation lead a list of accepted sections and compatible kits that are available to issue together. Identify any accepted sections that cannot yet complete their planned run because a joint or end piece is missing. Store held packages in a marked location, separate from approved spares. If several units share the disputed feature, the buyer should decide the extent of further inspection with the supplier.

A discrepancy report should let the supplier answer one issue at a time. Include the order and line, package ID, expected item, quantity found, photograph and requested action. Record whether the response calls for identification, replacement, repair, or a formally accepted change to the order. When replacement goods arrive, link their own count and inspection back to the original discrepancy.

Place accepted sections and hardware in the storage condition specified for the delivered product. Mark the allocated route or store location on the issue list. Staff preparing for opening can then collect a complete set and see precisely which items still need a supplier decision. Beach access mat system and project specifications